Process


  • The irrigation dam which is being used for agriculture and drinking water is being drained through canal.
  • The same water came from  dam with high force and pressure passed through our Hydro power plant, which  we have our RBC i.e. Right Bank canal of 2×700kw and LBC i.e. Left Bank canal of 2×2200kw, both  combined generate 5800kw.
  • The flow when release from dam came through PEN STOCK and strike the propeller to drive the shaft which has gear box of ratio 1:10 to drive the generator and hence the electricity is been generated.
  • The said generated electricity is delivered to MSEDCL grid.